Start date: 02-November-2017
Due date: 30-July-2022
Status: Completed
Technical area:
Transportation – Road, Bridges & Highways
Employer:
Ministry of Territorial Administration and Infrastructure of the Republic of Armenia and its agent Road Department “SNCO”-Ministry of Regional Development and Infrastructure of Georgia
The aim of this project is the construction of a bridge on the Debed river between Armenia and Georgia countries in order to complete the Northern Corridor Modernisation Project for increasing the capacity of movements. The plan has taken into consideration a variety of factors including economic, operational, architectural, environmental, and aesthetic concerns. The structure designed for the bridge comprises 2 separate bridges of five 32 meters spans each. To this end, the overall length of the bridge would be 160 meters between the axes of neoprene bridge bearings of the abutments. The effective width of the decks is 11.85 meters, which sums to a total of 12.45 when the 3-meter width of sidewalks is added.